亚洲国产精品网站在线播放-亚洲国产精品网站久久-亚洲国产精品婷婷久久久久-亚洲国产精品婷婷久久-亚洲国产精品特色大片观看完整版-亚洲国产精品特色大片观看

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: av无码成人精品区日韩 | a亚洲欧美中文日韩在线v日本 | 熟女少妇内射日韩亚洲 | 中文日本永久精品国视频 | 91嫩草香蕉国产线懂你的网站 | 精品丝袜国产自在线拍av婷婷 | 日韩一级免费毛片 | 国产调教丰满欧美最近中文字幕mv高清在线 | 国产av无码专区亚洲av毛片费 | 成人精品一卡二卡三卡 | 欧美成人精品视频一区二区三区 | 四房播播最新地址 | 三区日本天堂少妇无码太爽了不卡 | wwwwxxxx免费视频| 好男人免费影院www神马 | 国产日韩免费av片 | 国产精品三级一区二区三区 | 日韩欧美a∨中文字幕国产自产一区c | 日韩人妻中文字幕在线视频 | 精品国产人妻一区二区三区 | 成年美女黄网站色 | 中文字幕一区二区三区在线观看 | 1024人妻一区二 | 无码av免费一区二区三区视频 | 国精产品一品二品国精在线观看 | 久久99国产乱子伦精品免费 | 久久久精品高潮美女毛片 | 国产福利久久青青草原 | 久久久91精品国产一区二区三区 | 国产网红欧美在线观看 | 一区二区三区91 | 中文字幕高清免费日韩视频在线 | 日本啊v | 亚洲自偷自拍另类图区 | 日韩欧美综合AV久久一区 | 无码高潮又爽又黄又刺激视频 | 国产精品无码麻豆放荡av | 国内精品久久久久影院日本 | 欧美三级视频在线播放 | 久久精品国产99国产精偷 | 欧美日韩一区精品视频一区二区 |